|
|
|
|
For Immediate Release Los Angeles, CA August 22, 2007 |
Press Contact: David Sommers Phone: (213) 974-1095 Fax: (213) 626-6941 |
|
Project Will Repair And Improve Intersections Impacted By Heavy Truck Traffic
Los Angeles County
Supervisor Don Knabe announced the approval of a transportation
infrastructure improvement project that is designed to minimize the
impact truck traffic has at several congested intersections. The
goals of the project are to improve the existing substandard
intersections by reinforcing the roadbed with stronger materials
that can withstand heavy trucks, and reducing toxic diesel emissions
by minimizing the time trucks spend stopped with engines idling at
these intersections. Artesia Blvd/Pioneer Blvd - Construct concrete pavement on Artesia Blvd from Pioneer to Flallon Ave. Estimated Contract Cost: $782,899 Florence Ave/Paramount Blvd - Increase curb radius at the southeast and northwest corner of the intersection. Santa Fe Ave/Pacific Coast Highway - Construct concrete pavement at the intersection and at the approaches (east, west, and south leg of the intersection) ### |
|